Project
G3 Ship Loaders
Export Grain Terminal (EGT): Longview, WA Agrico, on an EPC basis supplied the ship loaders for EGT, which is the first export grain terminal built in the U.S. in nearly 30 years.
Read MoreExport Grain Terminal (EGT)
Agrico, on an EPC basis supplied the ship loaders for EGT, which is the first export grain terminal built in the U.S. in nearly 30 years.
Read MoreTemco Grain Export Terminal
Agrico, on a turnkey design/build contract, provided two fixed-tower ship loaders, with rotating and shutting booms. These two loaders offer very good dust control while loading a Panamax vessel without needing to move it. Loading rate is 120,000 bu/hr (3,200 MTPH).
Read MoreVentspils Grain Terminal
Agrico designed, supplied all equipment and supervised installation of a complete grain export terminal, which included enclosed rail car unloading, grain drying, conveyance to storage, silo storage, reclaim and ship loading.
Read MoreBunge Grain Export Elevator
Agrico, on a design/build basis, supplied a three fixed tower ship loading system at a major grain export elevator (Bunge) in New Orleans, LA. These ship loaders feature rotating and shuttling booms that offer virtually dust-free loading while providing full coverage of Post Panamax vessels at 120,000 bu/hr (3,200 MTPH). Grain is received from three…
Read MoreMarathon Ashland Petroleum (MAP)
Agrico, on an EPC basis designed and built a complete pet coke handling system including; crushing, conveyance to outdoor storage, stockpiling, reclaim from storage, and delivery to a barge loader on a floating dock. Agrico also supplied paved and unpaved roads, fencing, and auto sampling. Conveyors included; at-grade (ground), elevated (supported on trusses) and totally…
Read More